The impressive twin blocks at the Maybank Complex in Bangsar, Kuala Lumpur, Malaysia, was a challenging project.

The foundation required a single continuous ready-mixed concrete pour of 13,500 m3 in 52 hours by HeidelbergCement’s subsidiary Hanson Malaysia – a first in the region.

Further information

Project Data

  • Maybank

    Owner

  • 13,500 m3 ready-mixed concrete

    Material

Dataran Maybank, Malaysia.